Expediting engineering

Expediting engineering

Expediting engineering

Expediting engineering

AIM Control's expediting engineering is to witness and inspect of the mechanical and electrical projects fabricated at site of manufacturing vendor under processing contract, including:

  • Purchase Order
    • Un priced
    • Amend unpriced
  • Requisition, Date Sheet & Drawings
    • Requisition
    • Data sheet
    • Drawings
  • Project Specification & Standards
    • General Specification
    • Engineering Standards
    • Technical Specification
    • Technical Drawing
    • Calculation Sheet
  • Vendor ITP & Other Documents
    • ITP
    • Vendor Documents
  • Waiver Deviation
    • Vendor's Deviation list - Final
    • Clarification
    • Deviation
  • Lessons Learned / Problem Occurred
    • Raw material
    • Painting
    • Manufacturing Data Record
    • Welding
    • NDT
    • Engineering Concern      
    • FAT

AIM_Control_Expediters_Inspectors

Expediting engineering activities

How to AIM Control Inspection Group's expediters and inspectors who is acting to control one project by their expediting & surveillance management activities

  • Mill certificates
  • Material identification
  • Welding production test plates / PQR's
  • Mechanical tests for test plates / PQR's
  • N.D.E. (RT, UT, PT, MT)
  • P.M.I.
  • Hardness test
  • Cryogenic test
  • Thickness test
  • Holiday test
  • Visual and dimensional
  • Weld preparation
  • Welding inspection
  • Anchor bolts and jig plate
  • Formed head
  • Flange face finishing
  • Internals
  • Pneumatic test
  • Hydrostatic test
  • Heat treatment
  • Impeller over speed test
  • Rotor balance test
  • Running test
  • Performance test
  • N.P.S.H. test
  • Vibration measurement
  • Noise measurement
  • String test
  • Leak test
  • Inspection after dismantling
  • Alignment check
  • Electrical certificates
  • Calibration certificates
  • Routine or type test
  • Electrical test
  • Loop test
  • Sequence test
  • Insulation resistance test
  • Wiring
  • Earthling
  • Final acceptance test
  • Tie-in points
  • Painting and coating
  • Preservation
  • Name plate
  • Tagging and marking
  • Packing
  • Quantity
  • I.R.B.

Expediting_engineering

The majority of AIM Control to conduct regular inspection of production and distribution of production, processing and ask them to commit as a contract. in addition, need to fully investigate all aspects of the supplier, producing enough capacity to meet demand fields of goods and products are the production, engineering, materials, and transportation transfer.

The results of the service is proposed to build solutions to meet the schedule, inform the customer about the real situation and is of all decisions taken to meet pre-defined schedule . AIM Control can perform expediting services to a group of activities forming a chain in the planning system, a selected number of activities or all activities of the project.

Expediting_engineering_inspection_of_ABB_Transformer_in_Vietnam

Scope of witness inspection of expediting engineering for the one ABB transformer projects example

  • Material Test
  • Appearance
  • Dimensional
  • NDT
  • Welding
  • Heat Treatment
  • Performance
  • Dismantling
  • Pressure Test
  • Quantity
  • Painting
  • Operation Test
  • Lining/Coating
  • Balancing
  • Mechanical Properties, Facing, Surface
  • Document review
  • Sound Level Test
  • Protection, Marking
  • Sequence Test
  • OLTC test
  • Preparation for Shipment

 

Contact us to booking


Written : AIMGroup®
Show
Filter by
Enter keyword
Activity
Online support
Hotline : +84888889879
Cell : +84 903 615 612
Email : aim@aimcontrolgroup.com
Skype :
Field
Worldwide Inspection Services Vietnam (H.O)