Banner top 1
AIM control
Activity
Field

Survey & Inspection Services of AIM Control

Machinery and equipment Inspection

Machinery and equipment Inspection

Machinery and equipment Inspection One of AIM Contro Inspection Groupl's strong points is inspection of production line and machinery and equipment. With fully qualified and experienced engineers, AIM Control has been providing a range of inspection and related services applicable to machinery, equipment, production line and investment project with high quality services. We have performed the inspection of a great number of high valued production lines, machinery and equipment for ...

 
Loading supervision inspection

Loading supervision inspection

Loading supervision inspection:Loading supervision / discharging supervision:This is AIM Control's cargo loading supervision of loading and/or discharging supervision service entails Controlling loading & unloading operations inspections in ports, factories, warehouses, silos, supplier's premises, etc. Weighing inspection/ assessment/ verify and sampling on cargo in silos, warehouses and storage areas as well as ship's holds, Containers. Place of ...

 
Incident claim investigation and Damage survey

Incident claim investigation and Damage survey

Incident claim investigation and Damage surveyAIM Control's experts are surveyors and consultant in providing the incident claim investigation and damage survey for all risks arisen for liability and adjusting as third party inspection over 50 years of experience..Scope of Incident claim investigation and Damage survey services Damage investigators Damage joint survey Damage appraisal Damage identifying Damage prevention witness and supervision Damage cargo sampling Damage cargo ...

 
Final random inspection

Final random inspection

The final random inspection and Loading supervision?AIM Control’s final random inspection carried out place at the end of production (seller’s vendor, premises, factory). The whole shipment quantity should be finished and available for sampling. Packing should be nearly (at least 80%) done, so that the cartons can be tallied.AIM Control’s loading supervision carried out after having results of final random inspection as P.O or receiving our client’s approval for loading. ...

Show
Filter by
Enter keyword