Fit-up InspectionFit-Up Inspection is carried out at jointing stage before welding for all of the different parts are closely connected in accordance with standards.CODE / STANDARD / SPECIFICATIONSpecification for pressure vessel. JGSNP-CE- ES -002 / Rev.0Specification for Inspection and test of vessel and H/E: JGSNP-CE- ES -003 / Rev.0General inspection Requirements: JGSNCP-PC-GS-009 / Rev.0ASME Sec. VIII Div.1: Boiler & Pressure Vessels (2007 Edition with 2009 Addenda).INSPECTION ...

 